Waste

Case Studies

Filter By:

Al Attar Tower

Al Attar Tower

Sheikh Zayed Road, Dubai

The Al Attar Business Tower, Dubai, features 38 floors of office space and has a height of 158 m. Marley’s soil & waste system was fitted to meet the high quality needed for the project specification standards.

View case study

Firepool Lock

Firepool Lock

Taunton, Somerset

A mixed use re-development of the former marshalling yard, situated between Taunton Railway Station and Firepool Lock. The Marley HDPE drainage system installed in the car park of this devlopment is manufactured to meet high standards of durability and reliability, offering an alternative solution to cast iron.

View case study

Hale Village

Hale Village

Tottenham, London

Utilising the technical design service from Marley Plumbing & Drainage has enabled United House to make significant savings in materials and labour costs on a multiple occupancy new build in Tottenham Hale. Marley's expert team was able to provide a solution that rationalised the number of soil stacks, reducing roof penetrations by 20 and requiring 35% less pipework.

View case study

Leicester student accommodation

Leicester student accommodation

Leicester

Hundreds of en-suite shower pods have been installed during the construction of a student accommodation building in the East Midlands using the soil and waste system manufactured by Marley Plumbing and Drainage, and in particular, the company’s recently redesigned eight-way collar boss.

View case study

Lords Cricket Ground

Lords Cricket Ground

London NW8

Lords cricket stadium was commissioned in time for the 1999 Cricket World Cup. The stadium in St. John’s is home to Marylebone cricket club. It is the first all aluminium, semi-monocoque building in the world.

View case study

Macdonald Hotel

Macdonald Hotel

Manchester

Marley Plumbing and Drainage supplied extensive pipework and fittings for the luxury McDonald Manchester Hotel in the heart of the city. A combination of PVCu Push-fit soil pipe systems, 15mm Equator pipes and manifolds from Marley were installed throughout the 10-storey building by contractors CMB Fylde Engineering Ltd, Blackpool.

View case study

Sandhurst Windmill

Sandhurst Windmill

Sandhurst, Kent

Not many things perplex the Marley Plumbing & Drainage Technical Services department, but even they were left scratching their heads when an enquiry came in to fit soil and waste components for two bathrooms and a cloakroom into a renovated Windmill at Sandhurst.

View case study

Westminster Lodge Leisure Centre

Westminster Lodge Leisure Centre

St Albans

The new leisure centre has been designed to incorporate a variety of facilities, including a 25m x 10 lane main pool and a 17m x 10m training pool. To make the most of the space available the Marley soil and waste system was ideal for the job as the range allowed the customer to suspend the product from the basement ceiling.

View case study