open
Download Folder Help  View Download Folder
Download Folder
Hide Download Folder

--

 

You are here: Home > Contractor > Soil & Waste > Installation > WC Manifolds

Product Selector
*

WC Manifolds

WC Manifolds

WC Manifolds
*
WC Manifolds

Select the adjustable bend angle required from the above diagram according to the WC position. Cut the bend with a hacksaw, removing the unwanted portion.

*
WC Manifolds

File away any rough edges from the face of the fitting and wipe clean the bend and branch, with a dry cloth. Before jointing, the bend and branch should be checked for position and alignment, both parts being marked to ensure accurate assembly.

*
WC Manifolds

Apply a uniform coat of Marley solvent cement, to the short branch radial socket and to the external surface of the bend body.

*
WC Manifolds

Assemble the branch immediately, insuring that the marked lines on the fitting coincide. Do not twist the two parts of the branch during this operation, but maintain steady pressure until the spigot of the bend comes to rest against the internal surface of the branch socket. Quickly wipe off any surplus solvent cement from the inside and outside of the completed joint and hold in position for approximately 15 seconds.

*
WC Manifolds

Trim the WC socket to suit the toilet pan spigot length and remove any swarf with a file. Place the seal in the socket, apply a uniform coat of solvent cement about 15mm wide to the outside of the socket and inside the retaining cap. Push onto the socket and wipe off any surplus solvent cement.

*
-
*