Material Take Offs

By providing us with the appropriate drawings listed below, we are able to provide you with a list of the materials required for your project.

For rainwater

  • Elevation drawings of the building, showing the rainwater pipe locations.

  • Roof plans.

  • Type of gutter system and desired colour.

For soil & waste

  • Floor plans showing the location of sanitary appliances and SVPs.

  • Method of jointing – solvent weld or push-fit.

For underground

  • Drainage layout showing foul and surface water systems, including pipe sizes.

  • Invert and cover levels for inspection chambers

To request our material take off service please send the details via your local Sales Manager. A member of our Customer Services team will be happy to supply their details if you do not have them - call Customer Services on 01622 852585 or email customerservice@marleypd.co.uk.